INTRODUCTION
The Noombenberry Project is located 300 kilometres east of Perth in Western Australia, and is prospective for kaolinite and halloysite.
?
Exploration programs are underway.
Project Highlights
Maiden air-core drilling campaign has been completed on a nominal 200m x 200m grid patten for a total of 197 holes for 4,430 meters
Drilling intersected bright white kaolin up to 50m thick across the 18km2 area drill tested which remains open to the north, south, east, and west.
Noombenberry Halloysite project covers 54km² near Merredin, less than 300km from Perth, with Fremantle Port easily accessible via the Great Eastern Highway.
?
All services required for a low-cost mining operation are in close proximity.
?
Mineralisation is predominantly outcropping and flat lying over the project area.
The assay results of raw samples displayed grades of Al203 of up to 25%.
?
Identification of Halloysite located in multi-site surface sampling
?
Testing conducted by UK based First Test Minerals, specialists in kaolin for 30 years
Good halloysite occurrence at multiple sample sites – forming as ‘plates’ and ‘tubes’
Halloysite at up to 15% by weight at sample site #4 noted (45 – 180um)
Native title period currently in advertising period, grant expected in 1st quarter
Historical drilling located in project area, data to be reviewed and assessed for future drilling program
link URL here:
https://www.latinresources.com.au/noombenberry